Sign up to receive a text message or email when new bids are added!
Bid Number: 2020-Q
Bid Title: Pollard Road Sidewalk Project TAPAA-TA17 (933)
Category: Construction: Roads/Sidewalks/Boardwalks/Parking Lots/Parks ...
Status: Open
Additional Status Information: Opening Date changed to 9-21-2020 @ 11:30a.m. due to Hurricane Sally
Bid Recipient: Suzanne Henson @ City of Daphne

Description:

The overall scope of work shall include the installation of 5 ft wide sidewalk with pedestrian crosswalks and signage where required, along with relative grading work, drainage crossings, and utility relocations to accommodate the new sidewalk. The bidding of the project is comprised of a Base Bid section, an Add Alternate 1 section, and an Add Alternate 2 section. Breaking down the bid this way allows the Owner to more efficiently utilize the amount of available funds. Contractors shall include all three sections with their bid. The Bidder will be responsible for providing the material and installation of all items of work shown in the plans. The Base Bid section begins at STA 0+00 (Daphne Ave) and ends at STA 59+61 (Pollard Rd), just north of the roundabout at Whispering Pines Road. There is approximately 2630 SY of concrete sidewalk within the project boundary of the BASE Bid section. The Add Alternate 1 section begins at STA 59+61 (Pollard Rd) and ends at STA 71+61 (Pollard Rd), just south of the intersection with Creekbank Drive. There is approximately 580 SY of concrete sidewalk, 476 LF of wooden handrail, and 1400 SF of retaining wall within the project boundary of the Add Alternate 1 section. The Add Alternate 2 section begins at STA 71+61 (Pollard Rd) and ends at STA 91+00 (Pollard Rd), just north of the intersection with Landing Eagle Drive. There is approximately 1000 SY of concrete sidewalk within the project boundary of the Add Alternate 2 section.

One hundred fifty (150) calendar days are allowed for the construction of the project, regardless of bid option.

Publication Date/Time:
8/21/2020 4:40 PM
Publication Information:
See Adv
Closing Date/Time:
9/21/2020 11:30 AM
Submittal Information:
See Adv
Bid Opening Information:
09/21/2020 @ 11:30a.m.
Addendum Date/Time:
09-14-2020
Pre-bid Meeting:
09/09/2020 @ 10:00 a.m.
Contact Person:
The Engineer for the Project is Amanda Thompson. The Issuing Office for the Bidding Documents is Goodwyn, Mills & Cawood, Inc.. You may Amanda Thompson by e-mail at Amanda.thompson@gmcnetwork.com or Barbara Garner by e-mail at Barbara.garner@gmcnetwork.com.
Download Available:
yes
Fee:
see Adv
Plan & Spec Available:
See Adv for Engineer Contact info or contact Barbara.garner@gmcnetwork.com
Business Hours:
Monday - Friday, 8a.m.-5p.m.
Qualifications:
See Advertisement & Specifications
All entities bidding on this project must be pre-qualified with the Alabama Department of Transportation. Any sub-contractor for the project shall also be pre-qualified with the Alabama Department of Transportation.
Special Requirements:
Opening Date changed to 9-21-2020 @ 11:30a.m. due to Hurricane Sally
Related Documents:

Return To Main Bid Postings Page